BMS & controls in Dubai Production City (formerly IMPZ): local context
Dubai Production City, formerly the International Media Production Zone, is a free zone near Al Khail Road combining residential and office towers with light industrial and media-production facilities. It was largely developed from the mid-2000s. Manolia completed MEP for a 2B+G+15 tower with gym here. Plots here are mid-sized and tightly spaced, with towers sharing service roads and neighbouring construction sites.
- Towers with two basement levels need car park ventilation, sump pumps, and drainage designed for groundwater and stormwater ingress.
- Office and media spaces require flexible electrical distribution, UPS-backed circuits and dedicated cooling for equipment-heavy rooms with high sensible loads.
- The area is inland and dusty, so condenser cleaning and filter access are planned into the design.
Building types we serve in Dubai Production City (formerly IMPZ)
For factories and industrial plants, the work concentrates on process cooling and ventilation, heavy LV distribution, hazard-appropriate fire protection and plant that tolerates dust and high ambient temperatures.
Approvals and authorities in Dubai Production City (formerly IMPZ)
BMS installation in Dubai Production City (formerly IMPZ) sits within Dubai's regulatory framework. The authorities you will meet are:
- Dubai Development Authority (DDA)
- Dubai Civil Defence (DCD)
- Dubai Electricity & Water Authority (DEWA)
- Al Sa'fat — Dubai Green Building Evaluation System (Al Sa'fat)
- ASHRAE standards (62.1, 90.1) (ASHRAE)
Scope of work
- Points schedule development listing every sensor, actuator, alarm and meter to be monitored or controlled.
- Control sequences for chiller staging, pump speed, AHU temperature and fresh-air control written and tested.
- Commissioning and operator training with a sequence-of-operations document for future reference.
- Integration with district cooling ETS valves and meters, so return temperature and consumption can be trended against the provider's bills.
Systems we install
- BACnet and Modbus integration with chillers and meters
- Operator workstations and web-based graphics
UAE site and climate challenges
- Sensors in dusty plant rooms and fresh-air ducts drift faster than in cleaner climates, so calibration checks and replacement intervals are included in the maintenance schedule.
- Very high summer cooling loads make energy monitoring valuable, so meters on chillers, pumps and major AHUs allow efficiency to be tracked month by month.
- Depth of integration, from basic plant monitoring to full control of fan coils, lighting and metering, with each level adding points, cost and commissioning time.
Relevant Manolia projects
2B+G+15 residential tower, IMPZ
Dubai Production City (formerly IMPZ) · MEP · Completed
Full MEP package for a two-basement residential tower with gym.
Shopping mall, DIP
Dubai Investments Park (DIP) · HVAC · Completed
HVAC for a basement + ground + mezzanine retail mall.
Frequently asked questions
Which authorities approve BMS installation in Dubai Production City (formerly IMPZ)?
Approvals in Dubai Production City (formerly IMPZ) typically involve Dubai Development Authority, Dubai Civil Defence, Dubai Electricity & Water Authority and Al Sa'fat — Dubai Green Building Evaluation System. Exact routes depend on the plot, the master developer and whether the site sits in a free zone, so we confirm the authority matrix during mobilisation and prepare submissions accordingly.
Has Manolia delivered BMS projects?
Yes. Manolia carried out HVAC and BMS design and build for the main and language buildings at the American University of Sharjah as part of a renovation of occupied academic buildings. Manolia also integrates controls on central chiller plant packages, where chiller staging, pump speed and alarms are brought onto the BMS.