Manolia Group provides MEP contracting in Dubai Production City (formerly IMPZ), coordinating drawings and inspections with Dubai Civil Defence and connections with Dubai Electricity & Water Authority. Dubai Production City, formerly the International Media Production Zone, is a free zone near Al Khail Road combining residential and office towers with light industrial and media-production facilities.

MEP contracting in Dubai Production City (formerly IMPZ): local context

Dubai Production City, formerly the International Media Production Zone, is a free zone near Al Khail Road combining residential and office towers with light industrial and media-production facilities. It was largely developed from the mid-2000s. Manolia completed MEP for a 2B+G+15 tower with gym here. Plots here are mid-sized and tightly spaced, with towers sharing service roads and neighbouring construction sites.

  • Towers with two basement levels need car park ventilation, sump pumps, and drainage designed for groundwater and stormwater ingress.
  • Office and media spaces require flexible electrical distribution, UPS-backed circuits and dedicated cooling for equipment-heavy rooms with high sensible loads.
  • The area is inland and dusty, so condenser cleaning and filter access are planned into the design.

Building types we serve in Dubai Production City (formerly IMPZ)

For high-rise towers, the work concentrates on pressure-zoned water and drainage stacks, riser and plant-room coordination, stair pressurisation and a cooling source sized for diversity across dozens of typical floors.

Approvals and authorities in Dubai Production City (formerly IMPZ)

MEP contracting in Dubai Production City (formerly IMPZ) sits within Dubai's regulatory framework. The authorities you will meet are:

  • Dubai Development Authority (DDA)
  • Dubai Civil Defence (DCD)
  • Dubai Electricity & Water Authority (DEWA)
  • Al Sa'fat — Dubai Green Building Evaluation System (Al Sa'fat)
  • UAE Fire & Life Safety Code of Practice (UAE FLSC)
  • ASHRAE standards (62.1, 90.1) (ASHRAE)

Scope of work

  • Tender review of consultant drawings and specifications, flagging missing load data, unclear interfaces and items that will not pass authority review before the price is fixed.
  • Material submittals and method statements prepared under a QMS structured to ISO 9001 requirements, with document control tracking every revision and consultant comment.
  • Procurement and supply of chillers, AHUs, panels, pumps and fittings with supplier evaluation, factory test witnessing where specified and controlled storage on site.
  • Handover with as-built drawings, O&M manuals, warranties and operator training, with annual maintenance contracts available after the defects period.

Systems we install

  • Soil, waste, vent and stormwater drainage including basement sump pumping
  • Sprinkler, hose reel, wet riser and fire alarm systems tied to smoke control

UAE site and climate challenges

  • Coastal plots in Dubai Marina, JLT or Sharjah corniche areas see salt-laden humidity, so we specify coated coils, stainless or galvanised supports and sealed enclosures for exposed rooftop equipment.
  • Very humid summer nights cause condensation on poorly insulated chilled-water pipes and cold supply ducts, so vapour barrier continuity, insulated hangers and sealed valve jackets are inspected floor by floor before any ceiling is allowed to close.
  • Whether to appoint one MEP contractor for all disciplines or split packages: a single package simplifies coordination and accountability, while splits may lower individual prices but create interface gaps at handover.

Relevant Manolia projects

2B+G+15 residential tower, IMPZ

Dubai Production City (formerly IMPZ) · MEP · Completed

Full MEP package for a two-basement residential tower with gym.

Hassani Group factories & HQ, DIP

Hassani Group factories & HQ, DIP

Dubai Investments Park (DIP) · MEP · Completed

Factory complex, HQ and staff accommodation, all served from one central cooling station.

Frequently asked questions

Which authorities approve MEP contracting in Dubai Production City (formerly IMPZ)?

Approvals in Dubai Production City (formerly IMPZ) typically involve Dubai Development Authority, Dubai Civil Defence, Dubai Electricity & Water Authority and Al Sa'fat — Dubai Green Building Evaluation System. Exact routes depend on the plot, the master developer and whether the site sits in a free zone, so we confirm the authority matrix during mobilisation and prepare submissions accordingly.

What similar work has Manolia completed near Dubai Production City (formerly IMPZ)?

Relevant reference work includes 2B+G+15 residential tower, IMPZ (MEP, completed). Each reference is listed with its scope and status as recorded in our company profile.

Can Manolia handle MEP for high-rise towers?

Yes. Manolia's track record includes MEP and HVAC on Sharjah towers of 23 to 52 typical floors and the Armada Towers in JLT, three G+50 buildings including a hotel. Tall buildings need pressure zoning on water risers, staged pump sets, stair pressurisation and careful riser coordination, all of which are handled in the shop drawing stage.

Next chapter

Tendering a building or MEP package?

Developers, main contractors and consultants: send drawings, BOQs or an RFQ to our engineering team. We review every enquiry and respond with a clear scope and programme.

Request a prequalification pack Send a project enquiry