Renovation and retrofit MEP in Dubai Production City (formerly IMPZ): local context
Dubai Production City, formerly the International Media Production Zone, is a free zone near Al Khail Road combining residential and office towers with light industrial and media-production facilities. It was largely developed from the mid-2000s. Manolia completed MEP for a 2B+G+15 tower with gym here. Plots here are mid-sized and tightly spaced, with towers sharing service roads and neighbouring construction sites.
- Towers with two basement levels need car park ventilation, sump pumps, and drainage designed for groundwater and stormwater ingress.
- Office and media spaces require flexible electrical distribution, UPS-backed circuits and dedicated cooling for equipment-heavy rooms with high sensible loads.
- The area is inland and dusty, so condenser cleaning and filter access are planned into the design.
Building types we serve in Dubai Production City (formerly IMPZ)
For high-rise towers, the work concentrates on pressure-zoned water and drainage stacks, riser and plant-room coordination, stair pressurisation and a cooling source sized for diversity across dozens of typical floors.
Approvals and authorities in Dubai Production City (formerly IMPZ)
MEP renovation in Dubai Production City (formerly IMPZ) sits within Dubai's regulatory framework. The authorities you will meet are:
- Dubai Development Authority (DDA)
- Dubai Civil Defence (DCD)
- Dubai Electricity & Water Authority (DEWA)
- Al Sa'fat — Dubai Green Building Evaluation System (Al Sa'fat)
- UAE Fire & Life Safety Code of Practice (UAE FLSC)
Scope of work
- Site survey of existing MEP systems, recording installed equipment, condition, nameplate capacities and every deviation from the old drawings, often with opening-up of ceilings at sample locations.
- Capacity checks on existing chilled water, electrical supply and water storage to confirm whether new tenants, kitchens or extra floors can be served without upgrades.
- Phased replacement of chillers, AHUs, switchgear and pipework in occupied buildings, using temporary cooling or power where a shutdown would affect residents or tenants.
- Fit-out MEP for offices, shops, restaurants, clinics and apartments within existing buildings, connected to base-building systems according to landlord technical requirements.
Systems we install
- New AHUs, fresh-air units and fan coil units in existing ceiling voids.
- New main panels, distribution boards and upgraded cabling for added loads.
UAE site and climate challenges
- Replacing cooling equipment during summer risks leaving occupants without AC when temperatures exceed 45°C. We schedule major plant changes for cooler months where possible, or install temporary chillers or packaged units to maintain cooling during the changeover.
- Corroded pipework and equipment in coastal buildings may leak when isolated and disturbed. Surveys identify high-risk areas, and replacement plans add new isolation valves, drain points and protection of finishes and tenants' goods below.
- Reusing existing distribution versus full replacement: reusing ducts and pipes saves cost and disruption, but may limit airflow, pressure and future capacity if they were undersized or corroded.
Relevant Manolia projects
2B+G+15 residential tower, IMPZ
Dubai Production City (formerly IMPZ) · MEP · Completed
Full MEP package for a two-basement residential tower with gym.
Deluxe villa, Emirates Hills
Emirates Hills · Electrical · Completed
Electrical and plumbing works for a high-end private villa.
Frequently asked questions
Which authorities approve MEP renovation in Dubai Production City (formerly IMPZ)?
Approvals in Dubai Production City (formerly IMPZ) typically involve Dubai Development Authority, Dubai Civil Defence, Dubai Electricity & Water Authority and Al Sa'fat — Dubai Green Building Evaluation System. Exact routes depend on the plot, the master developer and whether the site sits in a free zone, so we confirm the authority matrix during mobilisation and prepare submissions accordingly.
Do fit-outs require Civil Defence approval?
Fit-outs that change fire alarm devices, sprinkler layouts or smoke control usually require approval, and many landlords require it before handing over a unit. Requirements vary by emirate, free zone and building, so we confirm the route with the landlord and consultant before work starts.