Expertise · Area

Ventilation & smoke extraction in Aljada 

Manolia Group provides smoke extraction systems in Aljada, coordinating drawings and inspections with Sharjah Civil Defence and connections with Sharjah Electricity, Water & Gas Authority. Aljada is a large master-planned community being built near University City and the Emirates Road, with mid-rise apartments, townhouses, retail and leisure in phases since the late 2010s.

Ventilation & smoke extraction in Aljada: local context

Aljada is a large master-planned community being built near University City and the Emirates Road, with mid-rise apartments, townhouses, retail and leisure in phases since the late 2010s. It is one of Sharjah's biggest new developments and remains under active construction. The development combines residential neighbourhoods with retail, leisure and community buildings, delivered in phases by a single master developer, so infrastructure, utilities and access routes evolve as each phase is completed and handed over.

  • Phased community infrastructure means utility connections may be available at different times, so temporary power and testing arrangements are planned in advance.
  • Inland heat and dust demand derated air-cooled plant and protected intakes.
  • Mid-rise buildings and townhouses typically use VRF or air-cooled chillers, with plant locations fixed by master plan guidelines on screening and noise.

Building types we serve in Aljada

For malls and retail centres, the work concentrates on large-volume air handling, tenant-ready chilled water or refrigerant capacity, smoke extraction for atriums and car parks and food-court exhaust.

Approvals and authorities in Aljada

Smoke extraction systems in Aljada sits within Sharjah's regulatory framework. The authorities you will meet are:

  • Sharjah Civil Defence (SCD)
  • UAE Fire & Life Safety Code of Practice (UAE FLSC)
  • Sharjah Municipality (SM)
  • Sharjah Electricity, Water & Gas Authority (SEWA)
  • ASHRAE standards (62.1, 90.1) (ASHRAE)

Scope of work

  • Installation of car park ventilation with jet fans, main extract fans and CO or NO2 sensors controlling normal ventilation.
  • Fire-rated cabling and secondary power arrangements for smoke control fans so they operate during a fire.
  • Interface wiring with the fire alarm system for zone-by-zone activation and fan status feedback.
  • Cause-and-effect testing, door opening force checks and Civil Defence witnessed tests.

Systems we install

  • Car park jet fans and main extract fans
  • Smoke exhaust fans rated for high temperature

UAE site and climate challenges

  • Rooftop smoke fans and motors are exposed to extreme heat and direct sun, so motors, enclosures and fire-rated cabling are selected for high ambient conditions as well as smoke temperature.
  • Basement car parks in coastal towers can see condensation on cold surfaces when hot humid air is pulled in at high rates, so supply air paths and ramp openings are reviewed to limit wet floors and corrosion of jet fans.
  • Integration with BMS for monitoring, which helps maintenance teams identify failed fans, dampers or sensors without taking life safety control away from the fire alarm system.

Relevant Manolia projects

AUS Bowling City, Sharjah

AUS Bowling City, Sharjah

University City (Sharjah) · MEP · Completed

MEP design & build plus decoration for a G+4 leisure building.

Two Nahda residential towers, Sharjah

Two Nahda residential towers, Sharjah

Al Nahda (Sharjah) · MEP · Completed

MEP for two towers of 23 and 24 typical floors over parking podiums.

Frequently asked questions

Which authorities approve smoke extraction systems in Aljada?

Approvals in Aljada typically involve Sharjah Civil Defence, UAE Fire & Life Safety Code of Practice, Sharjah Municipality and Sharjah Electricity, Water & Gas Authority. Exact routes depend on the plot, the master developer and whether the site sits in a free zone, so we confirm the authority matrix during mobilisation and prepare submissions accordingly.

Does Manolia work in Aljada?

Yes. Aljada is in Sharjah, roughly 20–60 minutes from central Dubai depending on traffic. Site teams are mobilised from our Dubai headquarters with supervision, QA/QC and HSE staff assigned to each project.

Can you upgrade smoke control in an existing building?

Yes. Upgrades often follow Civil Defence inspections or a change of use. Work may involve replacing fans, adding dampers, rewiring interfaces and re-testing. Manolia surveys the existing installation, proposes changes to the consultant and carries out work in phases to keep the building operational.

Next chapter

Tendering a building or MEP package?

Developers, main contractors and consultants: send drawings, BOQs or an RFQ to our engineering team. We review every enquiry and respond with a clear scope and programme.

Request a prequalification pack Send a project enquiry

WhatsApp