Expertise · Area

Ventilation & smoke extraction in Al Taawun 

Manolia Group provides smoke extraction systems in Al Taawun, coordinating drawings and inspections with Sharjah Civil Defence and connections with Sharjah Electricity, Water & Gas Authority. Al Taawun runs along the northern shore of Al Khan Lagoon near Expo Centre Sharjah, a district of residential high-rises, office towers and shopping centres built mostly from the 2000s.

Ventilation & smoke extraction in Al Taawun: local context

Al Taawun runs along the northern shore of Al Khan Lagoon near Expo Centre Sharjah, a district of residential high-rises, office towers and shopping centres built mostly from the 2000s. Its towers sit on podium car parks fronting a busy main road. The area combines new developments with towers now due for system upgrades. Traffic along Al Taawun Road is heavy throughout the day.

  • Office and residential towers typically use central chilled-water plants with cooling towers or air-cooled chillers; replacement projects must keep cooling running while old plant is removed.
  • Expo Centre events and lagoon-side traffic create congestion peaks, so crane lifts and deliveries are scheduled around event days.
  • Lagoon humidity and salt drive corrosion on roof equipment and podium-level plant, so coatings and inspection regimes matter.

Building types we serve in Al Taawun

For office buildings, the work concentrates on VAV or FCU zoning for flexible floor plates, tenant fit-out interfaces, energy metering and BMS integration.

Approvals and authorities in Al Taawun

Smoke extraction systems in Al Taawun sits within Sharjah's regulatory framework. The authorities you will meet are:

  • Sharjah Civil Defence (SCD)
  • UAE Fire & Life Safety Code of Practice (UAE FLSC)
  • Sharjah Municipality (SM)
  • Sharjah Electricity, Water & Gas Authority (SEWA)
  • ASHRAE standards (62.1, 90.1) (ASHRAE)

Scope of work

  • Fire-rated cabling and secondary power arrangements for smoke control fans so they operate during a fire.
  • Interface wiring with the fire alarm system for zone-by-zone activation and fan status feedback.
  • Cause-and-effect testing, door opening force checks and Civil Defence witnessed tests.
  • Natural ventilation openings, automatic smoke vents and their actuators where the fire strategy relies on them, tested to open on alarm.

Systems we install

  • Stair and lobby pressurisation fans
  • Smoke exhaust fans rated for high temperature

UAE site and climate challenges

  • Pressurisation fans draw outdoor air that may be very hot and dusty, so intakes are positioned away from smoke exhaust discharges and fitted with sand louvres to keep fans and dampers working reliably.
  • Strong winds and sand can jam relief dampers and louvres, so these are checked during commissioning and included in periodic maintenance to ensure they open and close freely on demand.
  • Jet fan systems versus ducted car park extract: jet fans save ceiling depth and ductwork, but require careful layout, approved design analysis and coordination with sprinklers and lighting.

Relevant Manolia projects

Apartment-hotel building, Al Nahda Sharjah

Al Nahda (Sharjah) · MEP · Completed

MEP for a combined residential and hotel building with health club.

Al Mazroaa Tower, Sharjah

Al Mazroaa Tower, Sharjah

Sharjah · HVAC · Completed

HVAC for a 43-typical-floor tower with health club.

Frequently asked questions

Which authorities approve smoke extraction systems in Al Taawun?

Approvals in Al Taawun typically involve Sharjah Civil Defence, UAE Fire & Life Safety Code of Practice, Sharjah Municipality and Sharjah Electricity, Water & Gas Authority. Exact routes depend on the plot, the master developer and whether the site sits in a free zone, so we confirm the authority matrix during mobilisation and prepare submissions accordingly.

Does Manolia work in Al Taawun?

Yes. Al Taawun is in Sharjah, roughly 20–60 minutes from central Dubai depending on traffic. Site teams are mobilised from our Dubai headquarters with supervision, QA/QC and HSE staff assigned to each project.

Do smoke extraction fans need special cables?

Yes. Fans that must operate during a fire generally require fire-resistant cabling and suitable power supply arrangements so they keep running while the fire develops. Requirements are defined by the UAE Fire & Life Safety Code and the approved design.

Next chapter

Tendering a building or MEP package?

Developers, main contractors and consultants: send drawings, BOQs or an RFQ to our engineering team. We review every enquiry and respond with a clear scope and programme.

Request a prequalification pack Send a project enquiry

WhatsApp