Ventilation & smoke extraction in Jebel Ali: local context
Jebel Ali hosts the port and the Jebel Ali Free Zone (JAFZA), one of the region's largest logistics and industrial hubs, alongside industrial areas and staff housing. Building stock is dominated by warehouses, factories, cold stores and labour accommodation. Manolia completed MEP works for a Technopark warehouse here. Operations here run around the clock, so works inside existing facilities are planned to avoid disrupting logistics.
- Warehouses and factories need large electrical supplies, motor control centres and power factor correction, plus ventilation for heat-generating processes.
- Proximity to the coast and port means salt in the air, so external equipment, cable trays and supports need corrosion protection.
- Fire protection for high-piled storage involves high-flow sprinkler systems, large tanks and diesel or electric fire pumps sized for warehouse hazard classes.
Building types we serve in Jebel Ali
For warehouses and logistics buildings, the work concentrates on high-bay sprinklers or in-rack protection, smoke venting, dock and office HVAC, and LV for racking, lighting and material handling.
Approvals and authorities in Jebel Ali
Smoke extraction systems in Jebel Ali sits within Dubai's regulatory framework. The authorities you will meet are:
- Dubai Civil Defence (DCD)
- UAE Fire & Life Safety Code of Practice (UAE FLSC)
- Trakhees (PCFC) (Trakhees)
- Dubai Municipality (DM)
- Dubai Electricity & Water Authority (DEWA)
- Al Sa'fat — Dubai Green Building Evaluation System (Al Sa'fat)
- ASHRAE standards (62.1, 90.1) (ASHRAE)
Scope of work
- Stair and lift lobby pressurisation fans with relief dampers or variable speed control to maintain pressure without making doors hard to open.
- Fire-rated cabling and secondary power arrangements for smoke control fans so they operate during a fire.
- Cause-and-effect testing, door opening force checks and Civil Defence witnessed tests.
- Natural ventilation openings, automatic smoke vents and their actuators where the fire strategy relies on them, tested to open on alarm.
Systems we install
- CO and NO2 gas detection for demand ventilation
- Automatic smoke vents and actuators at roof or high level
UAE site and climate challenges
- Strong winds and sand can jam relief dampers and louvres, so these are checked during commissioning and included in periodic maintenance to ensure they open and close freely on demand.
- Basement car parks in coastal towers can see condensation on cold surfaces when hot humid air is pulled in at high rates, so supply air paths and ramp openings are reviewed to limit wet floors and corrosion of jet fans.
- Fan redundancy and secondary power arrangements, which add cost but determine how robust the smoke control system remains if one fan or one supply fails during a fire.
Relevant Manolia projects
Hassani Group factories & HQ, DIP
Dubai Investments Park (DIP) · MEP · Completed
Factory complex, HQ and staff accommodation, all served from one central cooling station.
2B+G+15 residential tower, IMPZ
Dubai Production City (formerly IMPZ) · MEP · Completed
Full MEP package for a two-basement residential tower with gym.
Frequently asked questions
Which authorities approve smoke extraction systems in Jebel Ali?
Approvals in Jebel Ali typically involve Dubai Civil Defence, UAE Fire & Life Safety Code of Practice, Trakhees (PCFC) and Dubai Municipality. Exact routes depend on the plot, the master developer and whether the site sits in a free zone, so we confirm the authority matrix during mobilisation and prepare submissions accordingly.
Can you upgrade smoke control in an existing building?
Yes. Upgrades often follow Civil Defence inspections or a change of use. Work may involve replacing fans, adding dampers, rewiring interfaces and re-testing. Manolia surveys the existing installation, proposes changes to the consultant and carries out work in phases to keep the building operational.