Expertise · Area

Ventilation & smoke extraction in International City 

Manolia Group provides smoke extraction systems in International City, coordinating drawings and inspections with Dubai Civil Defence and connections with Dubai Electricity & Water Authority. International City is a large low- and mid-rise community off the Al Ain Road and Emirates Road, organised into country-themed clusters of apartment buildings with ground-floor shops, alongside trading and warehouse areas such as Dragon Mart.

Ventilation & smoke extraction in International City: local context

International City is a large low- and mid-rise community off the Al Ain Road and Emirates Road, organised into country-themed clusters of apartment buildings with ground-floor shops, alongside trading and warehouse areas such as Dragon Mart. Built from the mid-2000s, it offers some of Dubai's most affordable housing and is densely occupied. Maintenance and refurbishment are a big part of the MEP workload here.

  • Low-rise apartment blocks typically run split or packaged units, so refurbishments focus on replacing ageing outdoor units, fixing condensate drainage and upgrading electrical distribution.
  • Approvals may run through Dubai Municipality or Trakhees depending on the cluster, with Civil Defence review for fire systems in retail and warehouse areas.
  • The open inland setting brings dust and heat, so outdoor equipment needs regular coil cleaning and adequate shading.

Building types we serve in International City

For malls and retail centres, the work concentrates on large-volume air handling, tenant-ready chilled water or refrigerant capacity, smoke extraction for atriums and car parks and food-court exhaust.

Approvals and authorities in International City

Smoke extraction systems in International City sits within Dubai's regulatory framework. The authorities you will meet are:

  • Dubai Civil Defence (DCD)
  • UAE Fire & Life Safety Code of Practice (UAE FLSC)
  • Dubai Municipality (DM)
  • Trakhees (PCFC) (Trakhees)
  • Dubai Electricity & Water Authority (DEWA)
  • Al Sa'fat — Dubai Green Building Evaluation System (Al Sa'fat)
  • ASHRAE standards (62.1, 90.1) (ASHRAE)

Scope of work

  • Installation of car park ventilation with jet fans, main extract fans and CO or NO2 sensors controlling normal ventilation.
  • Stair and lift lobby pressurisation fans with relief dampers or variable speed control to maintain pressure without making doors hard to open.
  • Smoke exhaust fans, smoke dampers and make-up air paths for atria, malls and corridors as required by the strategy.
  • Cause-and-effect testing, door opening force checks and Civil Defence witnessed tests.

Systems we install

  • Car park jet fans and main extract fans
  • Automatic smoke vents and actuators at roof or high level

UAE site and climate challenges

  • Basement car parks in summer accumulate heat and vehicle exhaust, so normal ventilation rates are controlled by CO and NO2 sensors to save energy while keeping air quality safe for drivers and attendants.
  • Pressurisation fans draw outdoor air that may be very hot and dusty, so intakes are positioned away from smoke exhaust discharges and fitted with sand louvres to keep fans and dampers working reliably.
  • Pressurisation control method: barometric relief dampers are simpler, while variable speed control maintains more stable pressure as doors open and close during an evacuation.

Relevant Manolia projects

Multi-storey parking & retail centre, DSO

Dubai Silicon Oasis (DSO) · MEP · In progress

G+3 parking and retail centre — MEP works in progress.

G+6 building with health club, DSO

Dubai Silicon Oasis (DSO) · MEP · Completed

Full MEP package delivered.

Frequently asked questions

Which authorities approve smoke extraction systems in International City?

Approvals in International City typically involve Dubai Civil Defence, UAE Fire & Life Safety Code of Practice, Dubai Municipality and Trakhees (PCFC). Exact routes depend on the plot, the master developer and whether the site sits in a free zone, so we confirm the authority matrix during mobilisation and prepare submissions accordingly.

What similar work has Manolia completed near International City?

Relevant reference work includes Multi-storey parking & retail centre, DSO (MEP, in progress). Each reference is listed with its scope and status as recorded in our company profile.

Who tests smoke control systems?

The contractor carries out pre-commissioning and full commissioning tests, including cause-and-effect checks with the fire alarm. Civil Defence then witnesses tests before issuing approval. Periodic testing during the building's life is the owner's responsibility, often handled through a maintenance contract.

Next chapter

Tendering a building or MEP package?

Developers, main contractors and consultants: send drawings, BOQs or an RFQ to our engineering team. We review every enquiry and respond with a clear scope and programme.

Request a prequalification pack Send a project enquiry