Expertise · Area

Ventilation & smoke extraction in Business Bay 

Manolia Group provides smoke extraction systems in Business Bay, coordinating drawings and inspections with Dubai Civil Defence and connections with Dubai Electricity & Water Authority. Business Bay is a dense tower district built around the extension of Dubai Creek next to Downtown, developed mostly from the mid-2000s onward.

Ventilation & smoke extraction in Business Bay: local context

Business Bay is a dense tower district built around the extension of Dubai Creek next to Downtown, developed mostly from the mid-2000s onward. Its blocks mix office towers, residential and serviced-apartment towers and hotels on tight plots with multi-level podium parking. Many buildings are now fully occupied, so a growing share of work is fit-out and system upgrades alongside new towers still rising on remaining plots.

  • Many towers connect to Empower district cooling, so the in-building scope centres on energy transfer stations, plate heat exchangers, secondary pumps and controlling delta-T to avoid low-return-temperature penalties.
  • Plots are tight and canal-side roads are busy, so tower crane slots, hoist bookings and night deliveries govern vertical logistics for risers, pipes and AHUs.
  • Office fit-outs in occupied towers need landlord approvals, Civil Defence modification drawings, and hot-work permits; tie-ins to sprinkler and fire alarm loops are usually done in agreed after-hours windows.

Building types we serve in Business Bay

For malls and retail centres, the work concentrates on large-volume air handling, tenant-ready chilled water or refrigerant capacity, smoke extraction for atriums and car parks and food-court exhaust.

Approvals and authorities in Business Bay

Smoke extraction systems in Business Bay sits within Dubai's regulatory framework. The authorities you will meet are:

  • Dubai Civil Defence (DCD)
  • UAE Fire & Life Safety Code of Practice (UAE FLSC)
  • Dubai Municipality (DM)
  • Dubai Electricity & Water Authority (DEWA)
  • Al Sa'fat — Dubai Green Building Evaluation System (Al Sa'fat)
  • ASHRAE standards (62.1, 90.1) (ASHRAE)

Scope of work

  • Fire-rated cabling and secondary power arrangements for smoke control fans so they operate during a fire.
  • Interface wiring with the fire alarm system for zone-by-zone activation and fan status feedback.
  • Cause-and-effect testing, door opening force checks and Civil Defence witnessed tests.
  • Natural ventilation openings, automatic smoke vents and their actuators where the fire strategy relies on them, tested to open on alarm.

Systems we install

  • Car park jet fans and main extract fans
  • CO and NO2 gas detection for demand ventilation

UAE site and climate challenges

  • Basement car parks in summer accumulate heat and vehicle exhaust, so normal ventilation rates are controlled by CO and NO2 sensors to save energy while keeping air quality safe for drivers and attendants.
  • Pressurisation fans draw outdoor air that may be very hot and dusty, so intakes are positioned away from smoke exhaust discharges and fitted with sand louvres to keep fans and dampers working reliably.
  • Whether to use dedicated smoke fans or dual-purpose fans that ventilate daily and switch to smoke mode, which saves equipment but needs high-temperature ratings and careful control priority.

Relevant Manolia projects

2B+G+15 residential tower, IMPZ

Dubai Production City (formerly IMPZ) · MEP · Completed

Full MEP package for a two-basement residential tower with gym.

Shopping mall, DIP

Dubai Investments Park (DIP) · HVAC · Completed

HVAC for a basement + ground + mezzanine retail mall.

Frequently asked questions

Which authorities approve smoke extraction systems in Business Bay?

Approvals in Business Bay typically involve Dubai Civil Defence, UAE Fire & Life Safety Code of Practice, Dubai Municipality and Dubai Electricity & Water Authority. Exact routes depend on the plot, the master developer and whether the site sits in a free zone, so we confirm the authority matrix during mobilisation and prepare submissions accordingly.

Can you upgrade smoke control in an existing building?

Yes. Upgrades often follow Civil Defence inspections or a change of use. Work may involve replacing fans, adding dampers, rewiring interfaces and re-testing. Manolia surveys the existing installation, proposes changes to the consultant and carries out work in phases to keep the building operational.

Next chapter

Tendering a building or MEP package?

Developers, main contractors and consultants: send drawings, BOQs or an RFQ to our engineering team. We review every enquiry and respond with a clear scope and programme.

Request a prequalification pack Send a project enquiry